A visit before you sign the handover certificate. Checklist of finishes and installations, urgent report so you don’t lose your window to raise a claim.
Before you sign the handover certificate


Warranty periods we reference, not rule on
When it’s used
At the handover of keys on a new development, before you sign the certificate. The report is delivered urgently: what’s found before signing carries far more weight than what’s claimed afterwards.
One flat rate, priced by size
Scaled to the size of the property. Confirmed before the visit, not dependent on what the report finds.
LOE warranties: what we check and what we don’t
What we do
We compare what’s been delivered against the specification sheet and plans, and reference the LOE warranty periods (1 year finishes, 3 years habitability, 10 years structure).
What we don’t do
We don’t rule on whether a specific defect is covered by the 10-year structural warranty, and we don’t close out a cause without testing. That’s determined by a chartered professional or the legal process.
What’s included and what isn’t
Included
- ✓Check of more than 280 control points across finishes and visible installations
- ✓Comparison against specification sheet and plans
- ✓Urgent report, prioritised ahead of the signing date
- ✓Reference to the LOE warranty periods that apply to each type of defect
Not included
- –We don’t negotiate with or confront the developer on your behalf: we document, we don’t represent
- –Ruling on 10-year structural warranty coverage without testing
- –Energy performance certificate or habitability licence
How we work
Before the visit
We ask for the specification sheet and plans where available, to compare on site.
On-site visit
Full walkthrough before you sign the certificate, using measuring instruments.
Urgent report
Document with findings and reference LOE periods, prioritised by your signing date.
Frequently asked questions
How far ahead should I book the visit?
As soon as you have a date for the handover signing. The earlier, the more room to have findings included in the certificate or raised with the developer.
Can I refuse to sign if defects turn up?
That’s a legal decision for you and, if needed, your lawyer. We document facts, we don’t represent legal positions.
What happens with defects that appear after signing?
They’re still covered by the LOE periods (1/3/10 years) referenced in your report. Our Pre-handover Renovation Check service covers follow-up reviews.
Does the price change if you find lots of defects?
No, never. The price is fixed before the visit, and doesn’t depend on what the report finds.
Don’t sign the certificate without an independent check
Tell us your signing date and the size of the property.
Request your quote
Tell us what you need and we’ll reply with price and availability, usually the same day. You can also message us directly on WhatsApp.
Your name
Your name
you@email.com
Phone
600 000 000
Area or approximate address
Alicante, Murcia…