Renovation Follow-up

2-3 visits tied to construction milestones, linked to payments to the contractor. For full renovations, especially when you can’t be on site the whole time.

2-3 visits

Tied to real construction milestones, not to dates

Site during demolition and new layout works
Home with renovation finished, end of works
No surprises

Payment is released with an independent check

When it applies

For full renovations, especially when you can’t be on site every day. Each visit lines up with a real construction milestone, and payment to the contractor is released only after an independent check.

Built for renovations that have no technical site management of their own. If you’ve already hired an architect or building surveyor to direct the works, that role already covers this kind of follow-up — there’s no point paying for both at once.

We work so the renovation goes well. Not so someone loses out.

For a serious contractor, this follow-up is protection: what gets caught on site is a cheap fix; what shows up two years later is a claim.

The milestone visits

The exact number depends on the actual scope of the renovation: 3 visits for a large full renovation, 2 for a more limited scope.

Milestone 1 · Demolition and installations

Before partition walls and finishes are closed up, while what will later be hidden is still visible.

Milestone 2 · Carpentry and finishes

For more limited-scope renovations, this merges with the previous one into a single visit.

Milestone 3 · End of works

Equivalent to the Pre-handover Renovation Check visit, included in the package.

First visit
299 €
Each additional visit
199 €
2 visits total 498 €
3 visits total 697 €

What’s included and what isn’t

Included

  • 2-3 visits tied to real construction milestones
  • Check of 280+ points depending on the phase of each visit
  • Short report after each visit, with a warning traffic light
  • Final handover report, equivalent to the Pre-handover Check

Not included

  • We don’t negotiate with or confront the contractor on your behalf
  • We don’t handle payments or retentions, only reporting
  • A structural fitness verdict without a laboratory test

Frequently asked questions

Does the contractor know there’s an independent follow-up?

Yes, they’re informed from the start. We don’t work behind anyone’s back.

What happens if a visit finds something serious?

It’s documented and reported straight away, without waiting for the next visit’s report, while it’s still cheap to fix.

Can I book just the final visit?

Yes, that’s the Pre-handover Renovation Check, available as a standalone service.

Why is it sometimes 2 visits and sometimes 3?

It depends on the actual scope of the renovation. It’s set in the proposal before work starts, not partway through.

Start the follow-up from the first milestone

Tell us the start date of the works and the scope of the renovation.

Request your quote

Tell us what you need and we’ll get back to you with price and availability, usually the same day. You can also message us directly on WhatsApp.

Name

Your name

Email

your@email.com

Phone

600 000 000

Approximate area or address

Alicante, Murcia…